← CatalogNot started
Setting out point data using a Total Station ( Topcon Part - 6)
The Engineering Surveyor · 7m 18s · 0.1 CE hr
Field Procedures
The Engineering Surveyor — public instruction filed under Construction Staking. “Setting out point data using a Total Station ( Topcon Part - 6).” Watch the module, then pass the topic quiz to post CE credit. The quiz checks the professional subject, not a transcript of the video.
Sign in to watch with progress tracking, unlock the quiz, and receive CE credit.
