← CatalogNot started
EDM settings of Topcon Total Station (Topcon part-3)
The Engineering Surveyor · 3m 6s · 0.05 CE hr
Field Procedures
The Engineering Surveyor — public instruction filed under Field Procedures. “EDM settings of Topcon Total Station (Topcon part-3).” Watch the module, then pass the topic quiz to post CE credit. The quiz checks the professional subject, not a transcript of the video.
Watch progress0%
Quiz unlocks at 80% watched, or when the player reports the video ended. Progress is saved to your account.
Loading YouTube player…
Module quiz
Watch at least 80% of the video (or confirm attendance if the player cannot track) to unlock these questions.
